WESTSIDE RECREATION CENTRE
We strive to be the engineering firm of choice, through personal attention to our clients’ success, and the ongoing development of our people.
Partners from Concept to CompletionTM
Partnership | Excellence | Quality | Sustainability
At The HIDI Group, we have always placed importance on ownership and transparency – as a 100% employee owned company, we enable our team to play a vital part in the firm’s direction, decision-making, and sharing of our founding principles and values.
The HIDI Group worked with the Westside Recreation Centre construction manager to develop mechanical systems concepts that would meet the energy performance requirements of this project without exceeding capital budgets and ensuring that the systems provided were easily operated and maintained by existing staff.
The Phase 1 addition included a medium efficiency boiler plant for perimeter heating, variable speed pumping, demand control ventilation on the variable flow air handling units, and a heat recovery unit provided for the new change rooms. In conjunction with building envelope and lighting systems provided the estimated energy savings are 36%.
The Phase 2 addition will not be certified. However, the systems were selected for efficiency. They included a high efficiency condensing boiler plant with low operating temperatures, in conjunction with variable speed pumps and variable speed air handling for ventilation. The condensing boiler plant served the space, ventilation, and pool heating for the phase 2 addition.
The Westside Recreation Centre has achieved LEED Silver certification
LOCATION: Calgary, Canada
CLIENT: Sahuri + Partners
OWNER: Westside Recreation Centre
ARCHITECT: Sahuri + Partners Architecture Inc.
SIZE: 82,000 ft² Addition + 17,000 ft² Renovation / 7,600 m² Addition + 1,600 m² Renovation
CONSTRUCTION VALUE: $38 Million CAD
PROCUREMENT TYPE: Design Build
COMPLETION YEAR: 2010
LEED: Silver
MARKET SECTOR: Sports & Entertainment