Mission

We strive to be the engineering firm of choice, through personal attention to our clients’ success, and the ongoing development of our people.

Commitment

Partners from Concept to CompletionTM

Values

Partnership | Excellence | Quality | Sustainability


At The HIDI Group, we have always placed importance on ownership and transparency – as a 100% employee owned company, we enable our team to play a vital part in the firm’s direction, decision-making, and sharing of our founding principles and values.


©2022 THE HIDI GROUP INC.
ALL RIGHTS RESERVED
St Regis Toronto
St Regis Toronto
St Regis Toronto
St Regis Toronto

ST. REGIS TORONTO

Designed by Zeidler Partnership Architects, The St Regis Toronto Hotel (formerly The Trump Hotel and Residence) is the first of its brand in Canada.  The Hotel includes 261 hotel suites, 118 condominium suites with a super penthouse, 2 levels of recreational space, a spa, a 5 star restaurant and bar, 6 levels of parking, and a residential sky lobby at level 31.

 

The HIDI Group provided the original base building consulting for the 800,000ft2 tower with a total value of $750 million.  Mechanical, electrical, plumbing, communications, A/V, security and lighting services were provided via Alula Lighting Design as part of its scope. The building is connected to the Enwave District Heating and Cooling System.  Connection to this system allows the building to be both energy and space efficient due to the lack of boilers and chillers required.

 

Challenges

One of the challenges faced during construction was that the building’s hotel and residence was still occupied and operational.

LOCATION: Toronto, Canada

CLIENT: InnVest Hotels

OWNER: InnVest Hotels
ARCHITECT: Zeidler Partnership Architects

SIZE: 800,000 ft² / 74,000 m²

CONSTRUCTION VALUE: $750 Million CAD

COMPLETION YEAR: 2018

MARKET SECTOR: Hospitality

AWARDS: Restaurant & Bar Design Awards - International Hotel Design Award (2019)