The HIDI Group provided mechanical, plumbing, lighting and electrical site development and shell building design services for 7 separate buildings totaling 60,590 ft2. This project required the coordination with utilities for new gas, water, electrical and communication services, tenant power distribution, fire alarm system design, elevator systems coordination and design and life safety systems design. The exterior lighting design was a key feature that exemplified the success of this project. This project was completed using BIM/Revit.
Sustainability Initiative
LED lighting systems were used extensively throughout the project as a means to reduce energy usage and well as extend the life of the system.
LOCATION: Lethbridge, Canada
CLIENT: RoyOp
OWNER: RoyOp
ARCHITECT: Gibbs Gage Architects
SIZE: 60,590 ft²
CONSTRUCTION VALUE: $16.5 Million CAD
PROCUREMENT TYPE: Design Bid Build
COMPLETION YEAR: 2016
MARKET SECTOR: Retail